![Playcore ultraPLAY uPLAY TODAY MADDIE'S CHASE UPLAY-006-N Assembly Instructions Manual Download Page 26](http://html.mh-extra.com/html/playcore/ultraplay-uplay-today-maddies-chase-uplay-006-n/ultraplay-uplay-today-maddies-chase-uplay-006-n_assembly-instructions-manual_1566460026.webp)
Horizontal Dim.
Vert
ical Dim
.
3
1
11
10
9
6
2
5
4
8
7
12
22
21
15
18
14
13
20
17
19
16
23
FOOTING TABLE
Hole No.
Hor. Dim.
Ver. Dim.
Diagonal
1
36 3/4"
0
0
2
0
0
0
3
56 3/4"
22 1/2"
61"
4
39 1/2"
22 1/2"
45 1/4"
5
90 1/2"
11 1/4"
91 1/4"
6
90 1/2"
33 3/4"
96 1/2"
7
36 3/4"
45"
58"
8
0
45"
0
9
128 1/2"
73"
147 3/4"
10
36 3/4"
73"
81 3/4"
11
0
73"
0
12
28 1/2"
78 1/4"
83 1/4"
13
53"
81 1/2"
97 1/4"
14
128 1/2"
109 3/4"
169"
15
36 3/4"
109 3/4"
115 3/4"
16
0
109 3/4"
0
17
28 1/2"
104 1/2"
108 1/4"
18
55 1/2"
102"
116"
19
30"
116 1/2"
120 1/2"
20
53 3/4"
116 1/2"
128 1/4"
21
15 1/2"
124 3/4"
125 3/4"
22
21 1/2"
144"
145 3/4"
23
15 1/2"
163 1/4"
164"
IMPORTANT:
Never install play equipment over
hard, unresilient surfaces such as asphalt,
concrete,or compacted earth. It is the owner's
responsibility to ensure the
"minimum area required" contains an
appropriate amount of resilient material to
cushion accidental falls.
Placement for
12" Diameter x 18" Deep Holes
for In-ground installation
IMPORTANT:
POURING CONCRETE IS THE VERY
LAST STEP!
Concrete Required (if applicable):
Approx: 1.00 Cubic Yards (.77 Cubic Meters)
NOTE:
Suggested Min. concrete rating: 3000PSI
1. Review Use Zone. Mark the placement of one Deck Post #2. Create a horizontal line and a vertical
line with strings so you can use the footing table. All diagonal dims are from the center of hole #2 to
the center of any other hole.
NOTE: Survey flags may be used to mark the placement of each
hole.
2. Measure from first Rectangle Deck Post to mark the position of the remainig (3) posts. Check for
squareness using the 58" diagonal dimension.
3. Measure from the center of a Deck Post using the dimensions provided for each remaining hole.
252 in
[640.18 cm]
89 1/2 in
[227.04 cm]
TOP VIEW
Summary of Contents for ultraPLAY uPLAY TODAY MADDIE'S CHASE UPLAY-006-N
Page 2: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 18: ...Issued Revised TOOLS REQUIRED uPLAY TODAY 800 458 5872 www ultraplay com 16 4 12 2018 ...
Page 72: ...02 07 5065 ENGINEERING REVISIONS for A RWR UPDATED SLIDE EXIT NOTE 04 28 17 ...