Setting Up the Poly Medialign Dual Display System
Poly, Inc.
145
u
Attach the four cover panel support brackets to the lower horizontal frames using two M6 × 12
screws per bracket. Use the upper slots on the brackets for the upper rails. Use the lower slots on
the brackets for the lower rails.
v
Place the EagleEye Director II power adapter inside the channel of the lower rail of the upper
horizontal frame of the left assembly. Locate it to the left of the left wall mount bracket. Apply a
ferrite bead to the end of the coaxial cable that will connect to the camera base. Run the coaxial
cable along the horizontal support rail over to the left V-rail.
w
Connect a 1M C13-C14 cable to the power adapter. Route it down behind the speaker bracket
and rails and connect it to the PDU.
x
Route the mini-HDCI end of the EagleEye Director II camera cable through the codec mounting
bracket, behind the speaker bracket and support frames up to the horizontal support rail. Run it
along the horizontal support rail to the left V-rail.
y
Route the 3.5mm end of the EagleEye Director II camera audio cable through the codec mounting
bracket, behind the speaker bracket and support frames up to the horizontal support rail. Run it
along the horizontal support rail to the left V-rail.
(4) COVER PANEL
SUPPORT BRACKET
1342-85984-001
(8) M6 x 12mm SCREW
1601-68586-001