Setting Up the Poly Medialign Single Display System
Poly, Inc.
27
s
Attach the cover panel support brackets using four M6 × 12 mm screws. Use the top slots on the
upper bracket. Use the bottom slots on the lower bracket.
t
Place the EagleEye Director II power adapter inside the channel of the lower rail of the upper
horizontal frame. Locate it to the left of the left wall mount bracket. Apply a ferrite bead to the end
of the coaxial cable that will connect to the camera base. Run the coaxial cable along the
horizontal support rail over to the left V-rail.
u
Connect a 1M C13-C14 cable to the power adapter. Route it down behind the speaker bracket
and rails and connect it to the PDU.
v
Route the mini-HDCI end of the EagleEye Director II camera cable through the codec mounting
bracket, behind the speaker bracket and support frames up to the horizontal support rail. Run it
along the horizontal support rail to the left V-rail.
w
Route the 3.5mm end of the EagleEye Director II camera audio cable through the codec mounting
bracket, behind the speaker bracket and support frames up to the horizontal support rail. Run it
along the horizontal support rail to the left V-rail.
4
Continue the installation.
If you have a 65” display, refer to
Set Up the Poly Medialign 65 System
to continue the installation.
If you have a 75” display, refer to
Set Up the Poly Medialign 75 System
to continue the installation.
If you have an 86” display, refer to
Set Up the Poly Medialign 86 System
to continue the
installation.
(4) M6 × 12 mm SCREW
1601-68586-001
(2) COVER PANEL
SUPPORT BRACKET
1342-85984-001