4.1.8 ATTACH CEILING COVER
14. Move ceiling cover into place, and connect the 24V DC output for the LED indicator light.
15. Push the ceiling cover up against the ceiling and tighten the grub screw to lock it in place, as
shown in Fig.13.0.
4.1.9 ATTACH LIGHT FITTING TO CEILING TUBE
Fig. 14.0
16. Lift Phantom arm into place, and engage the 24V plugs as shown in Fig. 14.0.
17. Insert the arm bearing into the ceiling tube (taking care to align the threaded holes on the bearing
sheath with the countersunk holes on the ceiling tube), as shown in Fig. 14.0.
18. Insert the countersunk-head set screws as shown in Fig. 14.0.
19. Optional - remove or replace the lamp head - twist the conical end of the arm and pull the head
Fig. 12.0
Fig. 13.0