!
4.1.4 PRE CEILING FIT OUT
6. Assemble ceiling tube to ceiling plate, with the locking bolt and nut, as shown in Fig. 6.0
7. Reticulate 240V power to the power supply mounting location in accordance with local standards
and regulations. Attach the mounting plate earth, and reticulate power to the mounting location, as
shown in Fig 7.0.
4.1.5 RETICULATE POWER TO CEILING LEVEL
8. Drill cable access hole in the ceiling tube at the sub-ceiling level, as shown in Fig. 8.0. Take care to
remove power cords from the drilling area, before drilling.
9. Complete the reticulation of 24V power to the power supply mounting location as shown in Fig 9.0.
Fig. 6.0
Fig. 7.0
Fig. 8.0
Fig. 9.0