Installing the Display
18
EP5804K, EP5804K-T, EP6504K and EP6504K-T User Manual
Installing the Display
This section explains how to install your display. We suggest that you read the entire
section before you attempt to install the unit.
Before You Begin
Make sure you have all the items in these lists before you begin unpacking and
installing your display(s).
Tools/Equipment List
Depending on your installation, you may need one or more of the following items:
• String/string level
• Digital/laser level
• Ladders/lift
• Back brace
• Stud finder (if hanging display on a wall)
Other Things You May Need
• LCD screen cleaner or LCD wipes - available at most electronics stores
• At least two very strong people to help lift units into place
Plan Your Installation
You should have a detailed plan of how the units are to be configured. The plan
should include calculations for the following:
• Power (maximum of five units per 20A circuit for 115V operation)
• Cable runs
• Ventilation and cooling requirements
• If hanging display on a wall, location of studs in the wall
Prepare Your Installation Location
You should have prepared the area where you will install the unit. If custom
enclosures are part of the installation, they must be fully designed to accommodate
the installation of the displays, as well as the installed unit and ventilation and
cooling requirements.
If your installation included a lot of construction or dust, it is
highly recommended
that you clean all of the screens after the wall installation and configuration are
complete.