4
PREPARATION OF THE INSTALLATION
AREA
4.1 SAFETY PRECAUTIONS
4.2 MACHINE INSTALLATION LOCATIONS
5
INSTALLATION
5.1 KNEADING MACHINE LEVELLING
5.2 EQUIPMENT HOOK-UP
5.2.1 Electrical connection
5.2.1.1 Ground connection
6
KNEADING MACHINE START-UP AND
USE
6.1 COMMAND PANEL DESCRIPTION
6.2 START-UP PHASE
6.3 WORKING PHASE
6.4 SAFETY DEVICES
6.5 SHUT-DOWN PHASE
7
MAINTENANCE AND CLEANING
7.1 SAFETY PRECAUTIONS
7.2 ORDINARY MAINTENANCE FOR THE USER
7.2.1
General cleaning
7.2.2
Upper chain tensioning
7.2.3
Greasing the chains
8
POSSIBLE FAULTS
Summary of Contents for IF17 VS
Page 2: ......
Page 34: ...10 ELECTRICAL SYSTEM...
Page 35: ......
Page 36: ...11 EXPLODED DIAGRAM AND SPARE PARTS LIST IF 17 22 33 42 53 VS...
Page 37: ...IR 17 22 33 42 53 VS...
Page 44: ...17 01 2013...