
© 2019 Pivotal Commware, Inc. All Rights Reserved.
Pivotal Commware® is a registered trademark of Pivotal Commware, Inc.
Page 10 of 32
[3]
Apply the item(s) to be bonded within thirty minutes.
Installing Outdoor (ODU) and Indoor (IDU, alignment cling)
Components
Make sure you have carefully
and performed the
installing your Echo 5G.
Installing the ODU on the outside of your window
[1]
Remove the strips to expose the adhesive on the rails that are pre-attached to the rail mounting
tool.
[2]
Make sure the rails are level and you are mounting the unit at least four inches from any
window edge. Press it against the outside of your window
–
apply force and hold for 30
seconds.
[3]
Run your thumbs up and down the rails, pressing hard for 30 seconds.
[4]
Let the rails cure for one hour before sliding the device on.
Wait 60 minutes
[5]
Slide the ODU onto the rails.