![Piusi F00208A00 Instructions For Use And Maintenance Manual Download Page 57](http://html.mh-extra.com/html/piusi/f00208a00/f00208a00_instructions-for-use-and-maintenance-manual_1560382057.webp)
57/208
EN
6
7
O
COMMISSIONING
The user must always use materials that are compatible with the pumped liquid
according to the pump’s design conditions.
To commission the pump, proceed as follows:
1. Make sure that the product delivery and intake hoses are correctly connected -
check the signs on the pump:
“IN” = INTAKE (down) and
“OUT” = DELIVERY (up)
2. Check that the pump’s pneumatic circuit valves are correctly installed (on-off ball
valve, three-way valve and check valve).
3. Open the fluid intake and delivery valves.
it is forbidden to use the pump with fluids that are
not compatible with the pump’s construction mate-
rials or in a place that contains incompatible fluids.
WARNING
1
OUT
IN
2
3
Summary of Contents for F00208A00
Page 36: ...36 208 ...
Page 70: ...70 208 ...
Page 104: ...1 0 4 2 0 8 ...
Page 138: ...1 3 8 2 0 8 ...
Page 172: ...1 7 2 2 0 8 ...
Page 206: ......
Page 207: ......
Page 208: ...PIUSI S p A Suzzara MN Italy ...