MODEL
PACKING DIMENSIONS
TOTAL
WEIGHT
A ( mm )
B ( mm )
H ( mm )
( Kg )
DEPUROIL
660
300
330
25
H
INSTALLATION
H1
DISPOSING OF THE PACKING MATERIAL
The packing material does not require special precautions for its disposal,
not being in any way dangerous or polluting.
Refer to local regulations for its disposal.
H2
PRELIMINARY INSPECTION
-
Check that the machine has not suffered any damage during transport
or storage.
-
Clean the inlet and outlet openings of the pump, removing any dust or
residual packing material.
-
Check that the electrical specifications correspond to those shown on
the identification plate.
H3
ASSEMBLING
To assemble the machine refer to the exploded view under paragraph "O”:
1) Assemble the suction tube (Pos. 4-2-3-2-24-25) by connecting the
hose-holder installed on the tube ( Pos. 4) to the elbow installed
on the pump (Pos. 9). Use a suitable thread sealant.
2) Assemble the delivery tube (Pos. 4-2-3-2-1) by connecting the
hose-holder installed on the tube (Pos. 4) to the elbow installed on
the filter (Pos. 5). Use a suitable thread sealant.
3) Install the axle (Pos. 20 ) on the trolley (Pos. 22).
4) Install the wheels (Pos. 19 ) on the axle (Pos. 20) by locking them
by means of the bosses (Pos. 18).
5) Install the trolley foot (Pos. 17) using the screws (Pos. 28-13-12)
at the base of the trolley back (Pos. 22) and the fixing holes (Pos.
A).
Summary of Contents for DEPUROIL
Page 11: ...29 FILTER WITH COVER 3 4 G 1 ...