4. With the pack control ramp set for the job material you are running, adjust the deck to the right, so
the red hopper belts are 1/8" (3 mm) away from the trail edge of the booklet.
Red Hopper Belts 1/8" (3 mm) Away from Ramp
5. Tighten the lockdown knobs under the bulk loader hopper deck.
6. Adjust the bulk loader hopper side guides.
Adjusting Bulk Loader Hopper Side
Operator Adjustments
Pitney Bowes
Epic v3.1 (ZVE0) Operator Guide
May, 2018
Page 160 of 328
Summary of Contents for Epic v3.1
Page 31: ...This page intentionally left blank...
Page 55: ...This page intentionally left blank...
Page 187: ...This page intentionally left blank...
Page 199: ...This page intentionally left blank...
Page 215: ...This page intentionally left blank...
Page 335: ...This page intentionally left blank...