
TB-SRTG: Gas Floor Model Rethermalizer
INSTALLATION
L20-376, rev. 1 (08/18)
9
1) Probe
2) High Temperature Limit
1.8. INSPECTION
Before you begin filling and adjusting the appliance, perform the following visual checks:
After the appliance is in its permanent location, check the levelness. Any additional leveling that
is necessary can be performed as previously described.
Ensure that the probe, and high temperature limit is in place and secure. Check the high limit
bulb mounting screws to ensure that they are tight.
Review the installation portion of this manual and ensure that all steps have been followed and
executed properly.