51
TSP-16
5
6
7
8
5
6
7
8
A
B
C
D
E
F
Front
4
8
CN7000
5
CN7500
5
6
6
6
LCD A
SS
Y
LCD A
SS
Y
LCD A
SS
Y
S
tay (DNF19
8
5)
x
8
:
7
S
heet (DEC
3
720)
CN7
3
00
CN7501
CN7502
CN7100
9
9
9
LCD A
SS
Y
S
tay (DNF19
8
5)
FFC (DDD1755)
FFC (DDD1755)
6
Front
11
10
∗
4
∗
5
∗
5
∗
5
∗
5
TFT LCD
TFT LCD
Touch Panel
Packing/L
Packing/L
Packing/
S
Packing/
S
Note:
Don’t touch the display side of the TFT LCD and inside of
the Touch Panel barehanded.
Notes on assembling
Clear the dust by air blast before assembling.
∗
5: When replacing the TFT LCD, attach the two new Packing/Ls
and two new Packing/
S
s.
Backlight
Cable
Hook
Rib
Boss
S
tay A
SS
Y (DEA1060)
Remove the screw (BBZ
3
0P060FTB) and
then remove the
S
heet (DEC
3
720).
Disconnect the two connectors.
Note on assembling:
Bend the FFC (DDD1755) as shown in the
photo below.
Disconnect the four connectors.
Note:
CN7
3
00 and CN7502 connectors have lock
mechanisms.
Remove the eight screws. (BPZ
3
0P0
8
0FNI)
Remove the LCD A
SS
Y (with the
S
tay).
Remove the three screws (BBZ
3
0P060FTB)
and then remove the LCD A
SS
Y from the
S
tay (DNF19
8
5).
Release the Backlight Cable from the hook
of the
S
tay A
SS
Y (DEA1060).
Note on assembling
∗
4: Place the Backlight Cable between boss and
rib of the
S
tay A
SS
Y (DEA1060).
Push it out from the top side and then
remove the TFT LCD and the Touch Panel.