Operating Manual: PSS 3075-3 Series
4-5
• The output power-up tests are a component part of the system’s self
check. The self check is carried out when voltage is returned, on start up
(transfer from STOP-RUN) and also during operation.
• Operating system call SB255, function 2 in OB120 is required to
deactivate the power-up test on start up. To deactivate the power up-test
during operation, the operating system call must be contained in a block
that is run as part of each cycle. The power-up test will be performed
again as soon as the operating system call is no longer present.
NOTICE
Each time SB255, function 2 is called, data words DW200, DW201 and
DW202 must be written in full to ensure that outputs are not excluded from
the power-up test unintentionally, due to data words being unwittingly
overwritten during the program cycle.
Summary of Contents for PSS 3075-3 Series
Page 1: ...Programmable control systems PSS PSS 3075 3 Series Operating Manual Item No 21 071 10 ...
Page 13: ...2 3 Operating Manual PSS 3075 3 Series Notes ...
Page 28: ...Overview 2 18 Operating Manual PSS 3075 3 Series Notes ...
Page 46: ...Installation 5 6 Operating Manual PSS 3075 3 Series Notes ...
Page 72: ...Wiring the Inputs and Outputs 7 22 Operating Manual PSS 3075 3 Series Notes ...
Page 86: ...Operation and Maintenance 9 6 Operating Manual PSS 3075 3 Series Notes ...
Page 94: ...Technical Details 10 8 Operating Manual PSS 3075 3 Series Notes ...
Page 98: ...Appendix 11 4 Operating Manual PSS 3075 3 Series Notes ...