PSEN 2.2p-20
Operating Manual PSEN 2.2p-20
20915-EN-08
10
–
For details of how to perform the test for shorts across the contacts, please refer to
the operating manual for the relevant evaluation device.
Pin assignment
NOTICE
The colour marking for the connection lead only applies for the cable that
Pilz supplies as an accessory
The safety switch is shown in an unoperated condition.
Assignment of
the 4-pin con-
nector
1
2
3
4
[1]
[2]
[3+]
[4]
White
Brown
Blue
Black
Requirements and connection to evaluation devices
For use of PSEN 2.2p-20 in accordance with DIN EN 60947-5-3 an evaluation device must
be connected.
Connect the PSEN 2.2p-20
}
either
with a certified Pilz evaluation device
}
or
with an evaluation device with defined properties
Certified Pilz evaluation devices are, for example:
}
PNOZelog for safety gate monitoring
–
PNOZ e3.1p, PNOZ e3vp
–
PNOZ e5.13p
}
PNOZmulti for safety gate monitoring
Configure the switch in the PNOZmulti Configurator with switch type 2.
}
PSS for safety gate monitoring with standard function block SB064, SB066 or
FS_Safety Gate
}
PSSuniversal PLC for safety gate monitoring with function block FS_SafetyGate
A full list of the certified Pilz evaluation devices (type examination certificate) is available in
the download area (http://www.pilz.com/support/downloads).
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.
Defined properties of evaluation devices:
}
2-channel with feasibility monitoring
}
Open circuit monitoring of the safety switch is performed
}
The inputs and outputs of the evaluation device must fulfil the requirements of
IEC 61131