PSEN 2.2p-20
Operating Manual PSEN 2.2p-20
20915-EN-08
11
}
Technical data of the evaluation device must fulfil the requirements in the
of PSEN 2.2p-20
–
Always comply with the max. switching current safety contacts of PSEN 2.2p-20.
}
Outputs at the evaluation device must only be switched on again when both reed con-
tacts at the safety switch have been opened and closed (partial operation lock)
INFORMATION
Risk time in accordance with DIN EN 60947-5-3
The risk time is made up of the reaction time of the sensor (see
) and the processing and delay times of the evaluation
device (s. operating manual for the relevant evaluation device).
Y1
A2
A1
11 12
14
Y2
Y3
Y4
1
2
3
4
13
23 24
21
22 31
33 34
32 41
43 44
42
1 2
3 4
11 12
14
13
1 2
3 4
21 22
24
23
1 2
3 4
31
33 34
32
1 2
3 4
41
43 44
42
+24 V
I0.0
I0.1
I0.2
I0.3
+24 V
0 V
PSEN i1
PLC
PSENmag
Evaluation device
Input circuit
Input circuit
Fig.: Dual-channel connection of four PSENmag to the input circuits of an evaluation device