Husky 12 Foam System
/ 4-31
MAINTENANCE
Question
Reason for Question
Test Procedure
P.
Is the ground circuit OK?
The foam system must
have an adequate ground
circuit (continuity) for the
system to operate.
Check ground circuit 1640. Refer to
information.
1149
Repair ground circuit.
No
Yes
Replace LVDT per service
group 7950-P-007.