5 Installation
U651 Rotation Stage
MP136E
Version: 1.3.0
21
Figure 7: U-651, M3 holes for fixing the load
Requirements
You have read and understood the general notes on installation (p. 15).
You have mounted the U-651 onto an underlying surface (p. 18) properly.
The U-651 is
not
connected to the controller.
You have prepared the load so that it can be fixed to the mounting holes in the
platform:
−
The gap between the center of gravity of the load and the center of the platform is
as small as possible in all directions.
−
At least three points are provided for fixing the load on the platform.
Tools and accessories
At least three M3 screws of suitable length (p. 42)
Suitable tool for tightening the screws
Fixing the load
1.
Align the load on the U-651 so that the mounting holes in the load and the holes in the
platform are in line.
2.
Fix the load with at least three screws.
3.
Check that the load is sitting firmly on the platform of the U-651.