5 Installation
24
Version: 1.0.1
MP134E
Q-522 Miniature Stage
b) Introduce the screw into the counter-sunk hole.
c) Tighten the screw with a maximum torque of 35 Ncm.
d) Make sure that the screw head does not protrude from the counter-sunk
hole.
e) Repeat the steps a) to d) for the other counter-sunk hole in the base body
of the Q-522.
3. Make sure that the contact resistance at all connection points relevant for
mounting the protective earth conductor is <0.1
Ω
at 25 A.
4. Check that the Q-522 fits on the surface without backlash.
5.3 Setting Up a Multi-Axis System
The Q-522 can be used in XY systems.
NOTICE
Impermissibly high load on the stages!
In an XY system, the stage for the Y-axis must be moved as well. Impermissibly high
loads interfere with the motion and can damage the stages.
Include the mass of the moved stage in the calculation of the load to be moved.
For all stages in a multi-axis system: Do
not
exceed the maximum permissible
load.
For all stages in a multi-axis system, make sure that forces that act upon the
moving platform in the respective direction of motion do
not
exceed the active
push/pull force of the drive (p. 47).
INFORMATION
Any model of the Q-522 can be used as lower or upper stage.