5 Installation
Q-522 Miniature Stage
MP134E
Version: 1.0.1
23
Prerequisites
You have read and understood the general notes on installation (p. 19).
The Q-522 is disconnected from the electronics.
You have provided a suitable surface (for the required position and depth of
the holes for accommodating the screws and locating pins, see "Dimensions"
(p. 51)):
−
The surface must be connected to the protective earth conductor.
−
Two locating holes with
∅
1.5 mm H7 and two M2 mounting holes are
available in the surface.
−
The holes for accommodating the screws have to be sufficiently
conductive to ensure the proper functioning of the protective earth
conductor.
−
For applications with great temperature changes: The surface should
have the same thermal expansion properties as the Q-522 (e.g. surface
made of aluminum).
−
The evenness of the surface is
≤
2 µm.
You have accounted for the space required for a cable routing free of kinks
and in accordance with regulations.
Tools and accessories
LPS22.5006 screw set from the scope of delivery of the Q-522 (p. 13):
−
2 1.5 m6 x 3 dowel pins ISO 8734
−
2 M2x6 socket head cap screws ISO 4762
Suitable tools for fastening the screws
Mount the Q-522 on a surface and connect it to a protective earth
conductor
1. Align the Q-522 on the surface using the locating pins:
a) Introduce the two locating pins into the locating holes on the bottom side
of the Q-522 (see figure above) or in the surface.
b) Place the Q-522 on the surface so that the locating pins are inserted into
the corresponding locating holes on the other side.
2. Mount the Q-522 on the surface with two M2 screws.
a) Manually displace the moving platform of the Q-522 until one of the two
counter-sunk holes in the base body is accessible.