NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
06
7.13. Solenoid valve assembly
Loosen the screws as illustrated and slide out the card sup
-
port to access the solenoid valve assembly more easily.
Loosen the screws under the
front body cover as illustrated.
Disconnect the electrical and water
circuit connections.
Loosen the screws on the support.
To remove the discharge valve (A) as illustrated
firstly loosen the screws which hold the boiler
pin cover in place then remove it.
Loosen the screw under the
machine as illustrated.
Disconnect all electrical and water
circuit connections.
Remove the front body cover as follows:
- Loosen the screw (A) as illustrated
- Move the cover to the left to release the catches (B)
- Lift the lower part of the cover to release the catch
(C)
- Pull outwards
7.12. Relief valve
A
A
B
C
Summary of Contents for HD 8930
Page 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Page 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...