NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
7.9. Coffee pump and steam pump
04
Loosen the screws as illustrated
and remove the boiler pin.
Remove the boiler support, lift the pump
upwards from the two supports and
disconnect the electrical and water circuit
connections.
Remove the boiler support, lift the pump
upwards from the two supports and
disconnect the electrical and water circuit
connections.
Loosen the screw as illustrated, remove the boiler support
and disconnect the electrical and water circuit connections.
7.7. Coffee boiler and steam boiler
7.8. Boiler pin
Loosen the screws as illustrated and remove
the boiler pin cover.
Slip off the pin support and loosen the screw as illustrated.
Summary of Contents for HD 8930
Page 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Page 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...