NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
7.1. Outer elements
Remove the lid and the water tank, coffee
bean and ground coffee container lid, dreg
drawer, drip tray, brewing unit, coffee unit
support plate, coffee dispenser.
01
7.2. Coffee grinder
Loosen the screws as illus
-
trated and remove the grinding
adjustment lever handle.
Loosen the screw
as illustrated and
remove the grinding
adjustment lever.
Loosen the screws as
illustrated.
Vibration
damper.
Slide out the coffee grinder from
the vibration dampers as illustrated.
When disassembling, check the position of the
marks as illustrated and when re-assembling
return them to the same position.
Lift the upper lid and disconnect the
electrical and water circuit connections
which prevent it from being removed.
Disconnect the electrical
connections.
Coffee grinder exploded view
Slide out the pin
as illustrated and
remove the hatch.
Summary of Contents for HD 8930
Page 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Page 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...