NEW ROYAL
07 DISASSEMBLY
Saeco International Group
Rev. 00 / July 2011
Page / 09
02
To slide out the upper grinder support turn the nut (A)
anticlockwise until it is released.
Lower grinder (1) and
upper grinder (2).
7.3. Grinder blades
Loosen the screw as illustrated and slide out the lower
grinder. When re-assembling take care to replace the
three springs and three balls correctly.
When reassembling the adjusting lever (1)
position it in the center (2) and tighten the
screw as illustrated.
To adjust the distance between the grinders
- reconnect the coffee grinder and switch on
- turn the adjusting ring (A) slowly clockwise until the two
grinders touch each other
- turn the adjusting ring (A) anticlockwise one notch.
Release the upper grinder lid by pressing
on the fins as illustrated (A) and remove
the grinder by unhooking the catches as
illustrated (B).
A
A
1
2
A
B
1
2
Summary of Contents for HD 8930
Page 3: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 8: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 15: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 20: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 28: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 36: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 39: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 49: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 50: ...NEW ROYAL 08 NOTES Saeco International Group Rev 00 July 2011 Page 01 01 ...
Page 51: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 53: ...Saeco International Group Rev 00 July 2011 NEW ROYAL ...
Page 54: ...NEW ROYAL 10 WIRING DIAGRAM Saeco International Group Rev 00 July 2011 Page 01 01 ...