background image

mounting 

4

   DBC1220GL Installation Manual Rev I.docx

 

 

 
 
 
 
 

 

 
Select A Suitable Location 

This device is designed for indoor use only.  If 
installing  in  an  external  location,  the 
DBC1220GL  must  be  housed  in  a  suitable 
well-ventilated  enclosure.    Choose  a  dry 
location  that  will  be  accessible  after  the 
installation  is  complete.    The  DBC1220GL 
should  be  mounted 

vertically,  the  right  way 

up.  

An air gap of 100mm on each side and at 

the  top  and  bottom  of  the  device  should  be 
adhered to.  This air gap is required to ensure 
the  serviceability  of  the  DBC1220GL  without 
its  complete  removal  from  the  mounting 
surface.      This  device  may  emit  some 
mechanical  noise.    Take  this  into  account 
when deciding the mounting location. 

 

Fixing the Device 

The  DBC1220GL  has  integral  mounting 
brackets  attached  to  the  inside  of  the 
enclosure.    The  brackets  are  designed  to 
accommodate  4  fixing  screws  up  to  8mm 
diameter.    The  DBC1220GL  can  be  fixed  to 
the  wall  without  opening  the  cabinet  or 
removing covers.  Make sure no dust or other 
debris  enters  the  device  during  installation.  
Do not leave the front cover off for any length 
of time.  Excessive dust and dirt can degrade 
the cooling of the internal components. 

 

Allow for Cable Entry 

Supply  and  load  cables  enter  the 
enclosure  at  the  top.    If  these  cables  are 
fed  from  below  the  mounting  position, 
they  should  be  routed  around  the 
enclosure  to  enter  at  the  top,  or 
alternative knockouts are provided on the 
right  side  below  the  lid  line.    An 
alternative  method  is  to  stand  the 
enclosure    off  from  the  mounting  surface 
by  mounting  it  on  a  cable  tray  or  a 
Unistrut  style  product.    The  cables  can 
then  be  routed  between  the  enclosure 
and  the  mounting  surface,  and  enter  the 
enclosure  via  the  cutout  provided  on  the 
mounting  face.    The  control  cables  enter 
at  the  bottom  of  the  enclosure.    Control 
cables  should  never  be  run  in  the  mains 
voltage 

sections 

of 

the 

enclosure

 

Summary of Contents for dynalite DBC1220GL

Page 1: ...ller Installation Manual contents Warning 2 Hardware Controls 7 Features 2 Troubleshooting 8 Important Safeguards 2 Specification 8 Internal View 3 Mounting 4 Supply Load Cable Connections 5 Connecting Serial Control Cables 6 Supplied by ...

Page 2: ...ils Check Connections Treat this device as a switchboard that has been shipped Tighten all load carrying screw connections as vibrations from transport can cause MCB and terminal block screws to become loose Power Sources This device should only be operated from the type of supply specified on the front panel This device must be earthed Output Circuits The load on a circuit should not exceed the s...

Page 3: ...internal view DBC1220GL Installation Manual Rev I docx 3 For spare parts please call your nearest Dynalite Customer Service Centre and specify DBC1220GL ...

Page 4: ...accommodate 4 fixing screws up to 8mm diameter The DBC1220GL can be fixed to the wall without opening the cabinet or removing covers Make sure no dust or other debris enters the device during installation Do not leave the front cover off for any length of time Excessive dust and dirt can degrade the cooling of the internal components Allow for Cable Entry Supply and load cables enter the enclosure...

Page 5: ...ontrol Cables Load Control cables can be terminated on the 2 x 12 way terminal strips located directly above the Load terminals The left terminal block is the output for 0 to 10V DSI or DALI if selected by software setup Note that most types of 1 10V HF fluorescent ballast control wiring is polarity conscious The terminal of the ballast connects to the left terminal block and the terminal connects...

Page 6: ...ed for GND one pair paralleled for VE and one pair used for DATA and DATA Recommended Cable Colour Coding Green White pair Paralleled for GND Orange White pair Paralleled for VE Blue White pair Blue for DATA White for DATA Brown White pair Spare or for Join The colour coding scheme used is not critical as long as the same scheme is used throughout the installation Serial Cable Connecting Method Th...

Page 7: ... than 2 metres Service LED The Service LED has 3 signalling modes which are useful for troubleshooting Blinking slowly 1Hz Normal Operation Blinking fast 4Hz Network Activity Detected On Fault Service Switch The Service Switch has three functions 1 push Transmit Network ID 3 pushes All Channels 100 Push hold for 4 sec Reboot Top Set This control is not used in Ballast controllers Accessory Module ...

Page 8: ...ballast type Check actual wiring against ballast manufacturer s diagram Check 1 10V DSI DALI cable and settings specification Supply 230V 14 50 60Hz 3 Phase Y at 63A per phase Line Outputs 12 x Switched outputs at 20A per channel total device load 189A Control Outputs 12 x load control outputs selectable to 1 10V DSI or DALI Protection 12 x 20A 6kA single pole thermal magnetic circuit breakers Swi...

Reviews: