2-3-1
MK14NMA_PC
MECHANICAL ALIGNMENT PROCEDURES
Explanation of alignment for the tape to correctly run
starts on the next page. Refer to the information
below on this page if a tape gets stuck, for example, in
the mechanism due to some electrical trouble of the
unit.
Service Information
A.
Method for Manual Tape Loading/Unloading
To load a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Insert a cassette tape. Though the tape will not be
automatically loaded, make sure that the cassette
tape is all the way in at the inlet of the Cassette
Holder. To confirm this, lightly push the cassette
tape further in and see if the tape comes back out,
by a spring motion, just as much as you have
pushed in.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 for a minute or two to complete
this task.
To unload a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Make sure that the Moving guide preparations are
in the Eject Position.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 until the Moving guide
preparations come to the Eject Position. Stop
turning when the preparations begin clicking or
can not be moved further. However, the tape will
be left wound around the cylinder.
5. Turn the LDG Belt in the appropriate direction
continuously, and the cassette tape will be
ejected. Allow a minute or two to complete this
task.
B.
Method to place the Cassette Holder in the tape-
loaded position without a cassette tape
1. Disconnect the AC Plug.
2. Remove the Top Case and Front Assembly.
3. Turn the LDG Belt in the appropriate direction
shown in Fig. M1. Release the locking tabs shown
in Fig. M1 and continue turning the LDG Belt until
the Cassette Holder comes to the tape-loaded
position. Allow a minute or two to complete this
task.
Moving guide T preparation
(Eject Position)
LDG Belt
Push the locking tab gently to unlock
when loading without a cassette.
Side View
Moving guide S preparation
(Eject Position)
Push the tape
to load it.
UNLOAD
/EJECT
LOAD
Fig. M1
Top View
Cam Gear
LDG Belt (B)
UNLOAD
/EJECT
Fig. M2
Bottom View
Summary of Contents for 20MC4304
Page 5: ...1 1 1 TD901IB OPERATING CONTROLS AND FUNCTIONS ...
Page 6: ...1 1 2 TD901IB ...
Page 7: ...1 2 1 TD901IBR REMOTE CONTROL OPERATION ...
Page 8: ...1 2 2 TD901IBR ...
Page 12: ...1 3 4 TD901DC S 4 S 4 S 4 S 4 4 CRT Anode Cap CRT CBA Fig 3 ...
Page 77: ...1 9 3 TD901PEX S4 S1 X1 TAPE X9 X11 1 X8 X11 2 X25 X4 X2 X3 S3 S6 S7 S2 PACKING TAPE Packing ...
Page 95: ...1 6 1 T1006IB OPERATING CONTROLS AND FUNCTIONS ...
Page 96: ...1 6 2 T1006IB ...
Page 97: ...1 7 1 T1006IBR REMOTE CONTROL OPERATION ...
Page 98: ...1 7 2 T1006IBR ...
Page 149: ...R583 H Adjustment Sub CBA Top View TV VCR Section 1 12 41 1 12 42 BT1000F01021 A ...
Page 195: ...1 5 1 T1102IB OPERATING CONTROLS AND FUNCTIONS ...
Page 196: ...1 5 2 T1102IB ...
Page 197: ...1 5 3 T1102IB ...
Page 198: ...1 5 4 T1102IB ...
Page 294: ...2 4 9 N2466FTDA 43 41 42 L 13 Fig DM16 44 45 Slide P 9 Fig DM17 ...