www.pflow.com
P 414 352 9000
F 414 352 9002
6720 N. Teutonia Ave.
Milwaukee, WI 53209
2 | Section 13
15705-0023 | Rev - | 2018-08-15 | e-mail [email protected]
Section 13 |
M Series Preventive
Maintenance and
Schedule Checklist
✓
Action
How Often
Verify overall operation.
monthly
Verify that all level stops are flush with the floor level. Adjust as necessary.
monthly
Verify that all areas under and around the VRC are clean.
monthly
Verify that all gates and interlocks are functioning properly.
monthly
Verify that all electrical components are undamaged.
monthly
Verify that all gates and enclosures are undamaged and properly installed.
monthly
Verify that all push-button stations and Emergency Stops (e-stops) are functioning on
each level.
monthly
Identify any unsafe condition. Document and report the condition immediately to the customer
and then PFlow Industries, Inc. Product Support Department. Do not allow the lift to operate
when unsafe conditions arise.
monthly
Verify that all nuts and bolts are tight. Adjust as necessary.
3 months
Verify that all moving components are functioning properly.
3 months
Inspect and lubricate all chains (e.g., lift, tensioner, gate) with non-detergent, petroleum-based
SAE 30 oil. Inspect for wear, rust, bent, cracked, or binding links.
3 months
Inspect limit switches and operation. Adjust as necessary.
3 months
Verify that the chain sprocket position is centered over the chain tube. Adjust the position if
necessary. Apply Locktite® Blue 242 to the setscrew. Tighten and torque setscrew.
3 months
Inspect all additional options and accessories (e.g., DeckLocks, maintenance pins) and
operation. Adjust as necessary
3 months
Inspect the wheelblock guide rollers for rotation interference and wear.
3 months
Verify that all electrical connections are tight.
3 months
Verify that all tensioners are properly adjusted. Adjust as necessary.
3 months
Verify that the carriage is level. Adjust as necessary.
6 months
Inspect all welding, bracing, and anchoring for structural integrity.
6 months
Inspect the drivebase chain sprocket for wear.
6 months
Grease the pillow block bearings on the drivebase with lithium axle grease. Apply Locktite®
Blue 242 to the setscrews. Tighten and torque.
6 months
Inspect the motor and brake. Measure and record the air gap on the brake.
12 months
Remove the wheelblocks. Inspect the wheelblocks and safety cam for deterioration.
12 months
Customer signature:
Date work completed:
Name/Phone:
Authorized Technician(s):
Title:
Name:
E-mail:
Name: