ENGLISH
ENGLISH
8
9
11
7
10
DRAIN BODY INSTALLATION
7 SECURING FAUCET
From underneath sink, secure Faucet Body (
7A
) by placing Metal Washer (
7B
) and
threading Long Nut (
7
/
16
Hex.) (
7C
) onto Mounting Post (
7D
). Make sure that the bumps
on Metal Washer (
7B
) are facing up. Firmly hand tighten Long Nut (
7C
).
Secure Long
Nut (
7C
) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
8 WATER SUPPLY LINES
Gently separate hot and cold supply tubes (
8A
), approximately three inches apart.
Connect water Supply Lines (
8C
) to Faucet Inlets (
8B
). Hot water supply line goes to hot
inlet fitting indicated by red tag (
8D
). (
Supply lines not included
). Follow manufacturer’s
instructions when installing supply lines.
10 POP-UP INSTALLATION
Install and adjust Pop-Up (
10A
) using separate instructions supplied with the Pop-Up
assembly.
9 POP-UP ROD CONNECTION
Insert Lift Rod (
9A
) into hole at the back of Faucet Body (
9B
).
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
3
8B
8B
8C
8A
8C
8D
9A
9B
10A
HOT
COLD
7A
7B
7C
7D
8A
Summary of Contents for PARISA LG42 Series
Page 11: ...FRANÇAIS FRANÇAIS 11 ...