7.6.4 Filling up the cooling liquid on the Hepta 200 P | 300 P
C
o
o
lin
g
liq
u
id
Z
itr
e
c
M-
2
5
1
2
Fig. 39:
Filling up the cooling liquid on Hepta 200 P | 300 P
1 Cooling liquid
3
Sight glass
2 Filler screw
Procedure
1. Unscrew the filler screw.
2. Fill the cooling liquid as indicated on the sight glass.
3. Screw in the filler screw.
4. Check the fill level during operation.
5. Top up cooling liquid as required.
Maintenance
51/70