Mounting and commissioning the machine
8 - 4
57.006
8
.02
Commissioning
●
Check the machine, in particular the electric leads, for any damage.
●
Clean the machine thoroughly and oil it, or top up the oil ( see
Chapter 11 Care and
Maintenance
).
●
Have mechanics ensure that the machine’s motor can be operated with the available
electricity supply and that it is connected correctly to the terminal box. If not, do not
operate the machine under any circumstances.
8
.03
Switching the machine on/off
●
Switch on the machine ( see
Chapter 7.01 On/off switch
).
8
.01.06
Attaching the earthing wire / connecting the plug connections
Fig. 8 - 06
●
Screw the earthing wires from the sewing head, the main switch and the control box to
the stand.
●
Insert all plug connections in the control box as designated.
Fig. 8 - 07