
Mounting and commissioning the machine
8 - 4
8
.02
Commissioning
●
Examine the machine, in particular the electric cables and pneumatic connection tubes for
any damage.
●
Clean the machine thoroughly and then oil it.
●
Have qualified personnel check whether the machine can be operated with the available
voltage and whether it is connected properly in the terminal box. If there are any
irregularities do
not
operate the machine under any circumstances.
●
When the machine is running, the balance wheel must turn towards the operator. If this is
not the case, have the motor adjusted by qualified personnel (Parameter "800").
●
Connect the machine to the compressed air system. The pressure gauge should show a
pressure of 6 bar. If necessary, adjust the value, see
Chapter 12.05 Checking/adjusting
the air pressure.
Fig. 8 - 05
1
2
Fig. 8 - 06
3
4
5
4
●
Before commissioning the machine remove plug
1
from its hole and fill in oil up to
marking
2
, see
Chapter 12.02 Oiling the hook.
Plug
1
serves as a safety device for transportation and should not be used during
sewing operations.
●
Before commissioning the machine remove screw
3
and fill in oil up to the marking
(inspection glass on the front side of the machine), see
Chapter 12.03 Oiling the zigzag
drive.
8
.03
Switching the machine on/off
●
Switch the machine on, see
Chapter 7.01 Main switch.
●
Carry out a test run.
Summary of Contents for 2438 plusline
Page 111: ...Wearing parts 14 2 99 137 151 45 91 171 049 05 91 171 042 05...
Page 113: ...15 2 Circuit diagram View Version 23 01 03...
Page 114: ...15 3 91 191 445 95 Part 1 Version 29 01 02 Circuit diagram...
Page 115: ...15 4 Circuit diagram Version 29 01 02 91 191 445 95 Part 2...
Page 116: ...15 5 91 191 445 95 Part 3 Version 29 01 02 Circuit diagram...
Page 117: ...15 6 Circuit diagram Version 29 01 02 91 191 445 95 Part 4...