POWER UNIT
51
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
• The pulsair reed valve hose (9).
• The rear brake control cable (10).
- Remove the linkrod-to-engine connecting
pin (11).
Tightening torque: 50 Nm.
When re-installing, use a new nut.
- Remove the shock absorber upper
mount (12).
Tightening torque: 45 Nm.
- Lift the rear of the machine.
- Remove the power propulsion unit from
the frame.
- Remove the covers from the power unit.
9
10
11
N
12
Summary of Contents for Ludix 4T
Page 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Page 2: ......
Page 54: ......
Page 55: ......