![PESA RCP-GPIO Manual Download Page 11](http://html1.mh-extra.com/html/pesa/rcp-gpio/rcp-gpio_manual_1531770011.webp)
page 2.2
10/96
P/N 81905903860
INSTALLATION
2
Section 2
Installation
RCP-GPIO
All interconnection cables should be strain relieved and secured to the
equipment racks or other supporting structures. Failure to provide ad-
equate cable support may result in cables separating from connectors. If
cables are to be run under elevated flooring, they should be laid out in
cable racks if possible and tied to the cable racks as a guide. If cables are
run along the floor, do not allow then to lay in the work area behind the
racks. Stepping or tripping on the cables may result in connections being
pulled free or wire breakage inside the insulation. Figure 2-1 illustrates
the chassis installation.
To install the RCP-GPIO Control Panel take the following steps:
1. Align the control panel chassis with a slotted opening in the rack.
2. Install the bottom screws first.
3. Install the top two screws.
4. Tighten all four screws securely.
2.3 Location and Mounting Continued:
Figure 2-1 RCP-GPIO Chassis Installation