11
Permasense Ltd, Alexandra House, Newton Road, Manor Royal, Crawley, RH10 9TT, UK
www.permasense.com
+44 20 3002 0922
3.
Check the measured thickness displayed is in line with expectations.
4.
Press the Complete button. Verify that the Install State is Off and Installed is ticked in the footer of the
application.
5.
Remove the CC21 and fit the power module, tightening the two power module retaining bolts.
When the power module is fitted, the sensor will restart and try to join the WiHART gateway. In a
large network of 100 sensors this can often take 2 hours, and sometimes up to 6 hours.
Refer to
Installation guide
–
BP series power module
.
Sensor installation is now complete.
Task 5. Sealing the cladding
1.
Re-pack the cavity around the sensor with insulation
2.
Replace the cladding around the sensor and strap.
3.
Apply sealant where necessary to ensure the sensor and cladding are well sealed.
Good
waveform
Bad
waveform