![PerkinElmer OPERETTA Technical Manual Download Page 17](http://html1.mh-extra.com/html/perkinelmer/operetta/operetta_technical-manual_1530224017.webp)
1.8
Service Schedule
In order to guarantee a perfect and reliable function, the Operetta system should be
subjected to a regular inspection by the PerkinElmer service staff.
Certain maintenance tasks have to be performed regularly by the user. Please see
chapter 3 “Retooling and Maintenance” for further information.
1.9
Setup Requirements
Notice
The Operetta is sensitive to vibrations. Blurred images can be the
consequence.
l
Put the Operetta on a very stable bench or table.
l
Do not put other devices on the same table which cause
vibrations (e.g. a centrifuge).
l
Avoid any shocks or vibrations during measurements.
l
If the Operetta is integrated into an automated screening
system, you have to reduce the speed or frequency and
amplitude of components which cause vibrations (e.g. robots,
centrifuges, shakers etc.).
For a detailed list of requirements please refer to the
Operetta Site Readiness
Instructions
.
1 System Safety
Operetta Technical Manual
17
Summary of Contents for OPERETTA
Page 1: ...OPERETTA Technical Manual...
Page 5: ...1 System Safety 1 System Safety Operetta Technical Manual 5...
Page 16: ...1 7 Conformity 1 System Safety 16 Operetta Technical Manual...
Page 18: ......
Page 19: ...2 Hardware Description 2 Hardware Description Operetta Technical Manual 19...
Page 33: ...3 Retooling and Maintenance 3 Retooling and Maintenance Operetta Technical Manual 33...
Page 44: ...4 IT Policy 4 IT Policy 44 Operetta Technical Manual...
Page 48: ...4 1 3 3 Router 4 IT Policy 48 Operetta Technical Manual...
Page 55: ...5 Technical Data 5 Technical Data Operetta Technical Manual 55...
Page 61: ......