
23
MULTIPROP System
Instructions for Assembly and Use – Standard Configuration
A3 Horizontal Assembly
Erecting the tower
Risk of falling!
Check wedges for tightness!
– Before erecting, ensure that all
adjusting collars are resting against
their respective rubbing plates.
Safety hooks are closed.
– If necessary, secure tower with tem-
porary mounting aids against tipping
over, e.g. push-pull props, see A5.
Tower with 4 legs, with multiple
number of legs
1. Mount push-pull prop connectors for
the temporary mounting aid.
2. Completely insert the inner tubes (1.2)
of the bottom props.
3. Extend inner tubes (1.2) of the top
props. This prevents any large
bending moments developing which
impact on the tower on the base plate
with full force.
4. Attach slings: hook in 4-sling lifting
gear (11) into two opposite frames of
the topmost frame row or scaffold
tubes. (Fig. A3.10 + A3.10a)
5. Erect tower and align.
6. Extend inner tubes (1.2) up to the
required length and align so that the
tower stands upright.
7. Install missing frames.
8. Secure tower against tipping over.
9. Detach lifting gear.
(Fig. A3.11 – A3.11b)
Fig. A3.10
Fig. A3.10a
Fig. A3.11
Fig. A3.11a
Fig. A3.11b
1.2
11
11
bottom
top
AuV MULTIPROP EX.indb 23
07.01.16 11:56
Summary of Contents for MULTIPROP
Page 1: ...Edition 11 2015 MULTIPROP System Instructions for Assembly and Use Standard Configuration...
Page 11: ...9 MULTIPROP System Instructions for Assembly and Use Standard Configuration...
Page 41: ...39 MULTIPROP System Instructions for Assembly and Use Standard Configuration...
Page 53: ...51...
Page 54: ...52...
Page 55: ...53...