Operator’s manual Pentruder RS2 wall saw and Pentpak 3 HFi power pack – Original instructions
Page 12
!
Important!
•
The power pack is water cooled and must be drained from water when the
ambient temperature is in the proximity of or below 0 degrees Celsius.
See Connection to water supply.
•
Maximum water pressure during operation is 6 bar.
•
The water supply may only be connected to the input side of the Pentpak 3.
The quick disconnect couplings may not be replaced with couplings that are not
fully open when disconnected.
•
The power pack should only be operated when it is standing on its feet.
•
Connect the HFi-power pack only to the Pentruder RS2 HFi-wall saw.
Transport, preparations and mounting
Equipment
In addition to the modules of a complete machine the operator should have the following at hand:
Equipment
Used to
Hammer drill
Drill holes to secure the track feet
Hammer
Secure anchors
Anchors and bolts
Mount the track feet
Tool set for mounting
Mount the wall saw
Pentruder mounting templates
Simplify the positioning of track feet and setup of the Pentruder wall saw
Level
Mount the track correctly at set up.
Set square
Make sure the blade is 90° to the concrete (or at the angle required)
Measuring tape
Position track feet in relation to cut line.
Industrial vacuum cleaner
Collection of concrete slurry and water retention
Securing equipment
Secure the cut concrete slabs
Personal protection equipment. For
example: Safety helmet, safety
goggles and hearing protection, dust
protection in dusty environments,
protective clothes, shoes and gloves
Provide personal safety
Transport
All parts of the complete wall saw can be transported on the
transport trolley, with extra space for an up to Ø 800 mm saw blade
and optional equipment in the lower tool box. When the transport
trolley is used, the Pentpak can preferably stay on the trolley during
cutting.
It is recommended to use the transport trolley to transport the
machine in an ergonomic and safe way.
See also 4.3 Storage of the machine.
Unloaded transport trolley