
Installer manual Fleck 9000 SXT - Operation
Ref. MKT-IM-020 / C - 21.11.2019
67 / 118
8
Operation
8.1
Display
8.1.1
Display during operation
Examples:
• Valve in service with day time:
• Valve in service with volume remaining before regeneration:
• Remaining days before next regeneration:
• In volumetric regeneration flow, reserve 1223 litres remaining:
• In volumetric regeneration flow, exhausted reserve, immediate
or delayed start in regeneration depending on the adjustment:
• Tank in service:
Info
In delayed volumetric mode, the icon
flashes as soon as the reserve begins to be
used.
8.1.2
Display during regeneration
During a regeneration the display shows the current cycle step and the time remaining for that
cycle. The countdown for the time remaining starts only when the valve is in the cycle displayed.
Examples:
• Valve going to rapid rinse.
RR
are flashing:
• Refill cycle, 12 min 38 sec. left:
• Rapid rinse cycle, 2 min 17 sec. left:
Summary of Contents for FLECK 9000 SXT
Page 1: ...FLECK 9000 SXT INSTALLER MANUAL WATER PURIFICATION...
Page 78: ...Installer manual Fleck 9000 SXT Maintenance 78 118 Ref MKT IM 020 C 21 11 2019...
Page 80: ...Installer manual Fleck 9000 SXT Maintenance 80 118 Ref MKT IM 020 C 21 11 2019...
Page 82: ...Installer manual Fleck 9000 SXT Maintenance 82 118 Ref MKT IM 020 C 21 11 2019...
Page 85: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 85 118...
Page 87: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 87 118...
Page 89: ...Installer manual Fleck 9000 SXT Maintenance Ref MKT IM 020 C 21 11 2019 89 118...
Page 92: ...Installer manual Fleck 9000 SXT Maintenance 92 118 Ref MKT IM 020 C 21 11 2019...
Page 118: ...www pentairaquaeurope com...