Hardware Installations and Upgrades
Intel
®
Server System R2000LH2/LT2 Service Guide
13
2
Hardware Installations and Upgrades
Before You Begin
Before working with your server product, pay close attention to the Safety Information
at the
beginning of this manual.
Note:
Whenever you service the system, you must first power down the server and unplug all peripheral
devices and the AC power cord.
Tools and Supplies Needed
Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)
System Reference
All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
Note:
The Intel
®
Server System R2304LH2 is shown for illustration purposes in this document.
Cable Routing
When you add or remove components from your server system, make sure your cables are routed
correctly before reinstalling the server system cover. Use caution to make sure no cables or wires
are pinched and that the airflow from the fans is not blocked. Use the figures below to determine
the correct cable routing.
Note:
Red lines are for power connection, dot lines are for optional device connection.
For system with 4 x 3.5
"
hot swap hard drive bay
Note:
1.
To activate the port SCU1 (4-7) on the server board, a proper Intel
®
RAID C600 Upgrade Key
must be installed. For instructions, see Intel
®
RAID C600 Upgrade Key Installation Guide.
2.
A second SSD is supported when the optical drive is NOT in use.