
Make the first fold as shown and reinforce
it with a small amount of solder.
Make the second fold as shown.
Fold in the side ears of the retainer.
Fit the inner worm bearing into position
between the two plastic upstands. Fit the
slots formed at the sides of the Worm Retainer
around the upstands and slide the Retainer
downwards so that it rests on the bearing.
Bachmann 'Peak': Modifying the Bogie Drive
50/65
(c) PenBits Model Railways, All Rights Reserved
27/09/2021
Summary of Contents for PK017
Page 2: ......