![Pelton & Crane Helios HL3CB Installation Manual Download Page 25](http://html.mh-extra.com/html/pelton-and-crane/helios-hl3cb/helios-hl3cb_installation-manual_1523566025.webp)
25
053154 r17
Column Install (See page 22 for Illustration)
1. Apply grease (
*
) to threads on column (both
ends). Thread the column into the tripod. Insert
and tighten the set screws into the tripod
securing the column.
2. Remove stop screw from ceiling mount arm
collar. Set aside.
3. Install tripod cover and collar loosely onto
column.
4. Connect tripod power cable to ceiling mount
arm cable.
5. Push connected cables up into the column.
6. Thread ceiling mount arm collar onto column.
7. Rotate the ceiling mount arm to locate and
position the rotational stop.
8. Secure stop screw and set screws into the
ceiling mount arm collar.
9. Remove stem assembly from packaging.
Thread stem assembly into ceiling mount arm
and secure with set screws in arm. Be sure to
secure the set screws firmly to avoid the
possibility of the light falling and/or injury to the
operator or patient.
ColUMn InsTall
10. Apply Magnalube to stem and connect cable
from ceiling mount arm to cable in flex arm.
11. Push the QC Collar to the installation position.
Push rear knuckle of flex arm up onto stem
until the two clamps in the knuckle snap into
place in the groove in the stem. Pull the QC
Collar to the locked position (it must fully cover
the clamps in the knuckle).
12. Check to ensure stops are in correct location.
13. Locate two 3/32” pilot holes within tripod and
collar, using supplied drill bit with stop, drill 1/8”
hole to a depth of 5/8”. Insert roll pins (found
within the hardware kit sent inside the column).
14. Complete installation of tripod cover and cover
collar.
15. Secure stop screw in collar and all set screws.
See Maintenance & Adjustments for final installation.
Check light for operation.
Summary of Contents for Helios HL3CB
Page 1: ...Installation Manual Helios Light ...
Page 43: ...43 053154 r17 NOTES ...