Right Hand Installation
Left Hand Installation
CeIlInG MoUnTeD HelIos InsTallaTIon
Install wall switch between power supply
and power supply transformer. This
provides for safety and convenience during
installation or service. Wall switch can be
switched
off
during electrical storms to
prevent transformer damage caused by
voltage overloads. Wire nuts are furnished.
Positioning
The recommended ceiling positions for
various methods of operation are shown.
noTe:
The maximum height the ceiling flex
arm may be mounted is 10ft. (304.8 cm).
Pre-Installation of electrical Wiring
Stub out a 115 VAC, 60 Hz. (or 230 VAC
50 Hz) electrical supply. See position
of transformer box. Protect circuit with
appropriate fuse or circuit breaker (local
codes apply).
noTe:
For electrical supply connections,
use wiring suitable for at least 90°C
(194°F).
Provide adequate framing to support at
least 200 pounds (100kg) live load.
•For ceilings constructed using wood, joist
the tripod must bolt directly to the ceiling
joists and additional framing or cross
blocking using the provided hardware (3
bolts must be used).
•For other types of ceiling construction such
as suspended ceilings, it will be
necessary for installer to provide adequate
framing to support at least 200 pounds
(100kg) live load that will be secured to
ceiling structure before attaching the tripod
to framing.
•If tripod or frame is bolted to concrete or
metal the installer must provide the
necessary bolts, anchors and washers to
secure frame and/or tripod to ceiling
structure.
2
’
1’
½
2’
2
’
1’
½”
2’
WaRnInG
: It is the responsibility
of the dealer/contractor to provide
suitable support framing prior to
installation.