
6
6
Topsides, Decks and Below Decks 8.2.1
Gelcoat 8.2.1.1
Wood Surfaces 8.2.1.2
Window Maintenance 8.2.1.3
Below The Waterline 8.2.2
Bottom Cleaning 8.2.2.1
Bottom Preparation 8.2.2.2
Bottom Painting 8.2.2.3
Winches 8.2.3
Spars And Rigging 8.2.4
Cleaning Wire Rope and Rigging 8.2.4.1
Cleaning Synthetic Rope 8.2.4.2
Rigging Inspection 8.2.4.3
Engine System 8.2.5
Electrical System 8.2.6
Steering System 8.2.7
LAYING UP
8.3
Before Hauling 8.3.1
After Hauling 8.3.2
FITTING OUT
8.4
Summary of Contents for P31-II
Page 23: ...23 23...
Page 24: ...24 24...
Page 25: ...25 25...
Page 26: ...26 26...
Page 27: ...27 27...
Page 28: ...28 28...
Page 29: ...29 29...
Page 32: ...32 32...
Page 35: ...35 35...
Page 42: ...42 42 4 6 2 4 To reconnect coupling...
Page 45: ...45 45...
Page 46: ...46 46...
Page 48: ...48 48...
Page 50: ...50 50...
Page 51: ...51 51...
Page 56: ...56 56...
Page 58: ...58 58...
Page 59: ...59 59...
Page 60: ...60 60...
Page 61: ...61 61...
Page 64: ...64 64...
Page 74: ...74 74...
Page 75: ...75 75...
Page 76: ...76 76...
Page 78: ...78 78...
Page 79: ...79 79...
Page 80: ...80 80...
Page 81: ...81 81...
Page 82: ...82 82...