13
VII. MAINTENANCE SCHEDULE
Monthly maintenance:
1. Lubricate all moving parts with lubricant.
Fig.24
2. Check all connectors, bolts and pins to insure proper mounting.
3. Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check all fasteners and re-torque
Fig.24