5
III
.
INSTALLATION STEPS
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of base-plate (See Fig.
7).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit
(
See Fig. 8).
2. Move the lift aside with a fork lift or hoist, and open the outer packing carefully and
remove aside the top connecting assy. and parts box
(See Fig.
9
).
Shipment Parts list
Outer column
Parts box
Fig. 8
Fig. 9
Chalk Line
3542 mm
Fig. 7