Page 27
H
G
F
E
D
C
B
A
1
2
3
4
5
6
7
8
9
10
11
12
Sheet No:
IF IN
DOUBT ASK
PEAK SCIENTIFIC INSTRUMENTS Ltd 2013
PEAK SCIENTIFIC OWN THE COPYRIGHT FOR THIS DRAWING. NO INFORMAT
ION
CONTAINED IN THIS DRAWING MAY BE CONVEYED TO A THIRD PARTY WITH
OUT
THE WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
DESCRIPTION OF CHANGE:
REV/DCL:
ECN:
SIG:
APP:
DATE:
UNLESS OTHERWISE STATED:
DIMENSIONS IN mm. LINEAR TOLERENCES:
±0.25mm.
ANGULAR TOLERENCES:
±0.1°.
ALL MATERIALS SHALL BE COMPLIANT WITH THE RoHS DIRECTIVE
FOUNTAIN CRESCENT INCHINNAN BUSINESS PARK RENFREWSHIRE, PA4-9RE
TEL: +44 (0)141 812 8100 FAX: +44(0)141 812 8200 www.peakscientific.com
APPROVED BY:
DETAILED BY:
DATE:
DATE:
DRAWING TITLE:
PROJECT/LEAD ENGINEER:
DRAWING No:
DCL:
THIRD ANGLE PROJECTION
C
REV:
WD-PRECISION SL
PRECISION SL ELECTRICAL DIAGRAM
MREAVY
KRZEZWICKI
ICAMERON
20/11/2019
20/11/2019
1
A
SHEET 3 OF 5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1A
UPDATE SCHEMATIC TO LATEST REVISION OF DAUGHTER BOARD 2.0
KR
IC
16/12/2019
Auxiliary input
J14-2 GND
J14-1 (NPN)
S5
S3
S4
S1
S2
SB2
Separation tank
Water critical level
Water level low
Water level high
Pressure transducer
Start push button
+
>
-
J12-6
J12-5
J12-4
J12-3
J12-2
J10-4
J10-3
J10-2
J11-3
J11-2
J11-1
J13-3
J13-2
J13-1
J12-1
J10-1
+
>
-
+
>
-
+
>
-
U
+
>
-
J15-2 GND
J15-1 START
PEAK DAUGHTER BOARD