Start-Up Sequence
Before the Generator is connected to the application, the Generator
should be operated in isolation (i.e. not connected to the application)
for thirty minutes. This is to ensure any impurities present are purged
from the system. Failure to do this may harm the application.
Once this is done, the Generator can be re-connected to the mains and switched on.
Pressure will start to build in the internal storage tanks. Once this pressure is reached,
the compressors will continue to run until the internal tank upper pressure limit is
reached and the compressor has run for a period of at least two minutes.
The compressors will then rest until the internal tank lower pressure limits is reached.
Once this limit is reached the compressors will switch back on again. This compressor
cycling is normal and will continue throughout the operation of the Generator.
When the system has been operated for a period of 30 minutes, all the internal pipe-
work and storage tanks will have been purged with Nitrogen.
The Generator is now purged and the tubes can be connected at the rear of the unit.