
“
SAS Super IAQ” Rev. 1 Pg.
5
ENGLISH
3.3
PRELIMINARY INSPECTION
The apparatus is subject to specific working tests before shipping and it is carefully packed to
avoid possible damage during transit. However, a visible check should be carried out as soon
as possible to determine any transit damage. This must be reported immediately. The following
procedures should be followed to check that the unit is working properly.
The battery pack of the instrument must be charged for at least 4 hours before the test (14 hours
if slow battery charger is used).
SAS SUPER IAQ
After the ON/OFF button is pressed an automatic visual presentation will be displayed.
In the following displays, the entry of “XX” indicates numerical figures.
ACTION DISPLAY
I
N
T
E
R
N
A
T
I
O
N
A
L
Switch on the ON/OFF
switch (black button)
P
B
I
S
N
X
X
X
X
P
R
E
S
S
A
R
R
O
W
S
F
O
R
N E W M E N U S
E L E C T .
S
A
S
S
U
P
E
R
I
A
Q