52
6. Secure the Quick Connect Cord with a clamp.
7. Reattach the front cover (4 screws).
Quick Connect Cord
Clamp
Ground Wire
Connector
Wiring Throughway
Circuit Board
* Connecting the cord to the other unit, refer to
the unit’s Installation Manual.
Check the Quick Connect Multi System Installation
After install the Quick Connect System, do the
following step to check proper installation.
1. The
ON/OFF button
is ON.
2. Press the
MAINTENANCE button
.
(td: technical data)
3. Press the
ENTER button
to view the “Technical
Data”.
5. Check the Quick Connect Cord connection.
• Select
, then check
appears.
• If
appears, check the Quick
Connect Cord connection.
6. Open the front cover and a hot water fixture.
Press and hold the “Mode” and “Minimum”
Buttons on the Circuit Board simultaneously
for more than 3 seconds.
Check step 7 within 30 minutes.
7. Check the Combi Boiler operation.
* Please contactt Pavilion Customer Center at
1-855-443-8468 if you have any questions or
concerns.
NOTE
The Water Heater can be set as the
master unit in the quick connect
multi system. The master unit
controls the DHW ON/OFF status of
the Combi Boiler in the system. Once
turned on by the master unit, the
Combi Boiler will operate in stages
to satisfy the DHW demands.
8. Press the
BACK button
twice or let it sit for
approximately 10 minutes to return to the
home screen.
• Select
, then check
appears.
• If
appears, check the plumbling
and the Solenoid Valve.
When you are done, press the “Mode” Button
for more than 3 seconds, then close the hot
water fixture and the front cover.
MODE
MI
N
MA
X
Operation Display
Circuit Board
Minimum Button
Mode Button
Specifications for a solenoid valve
• Pipe size: 3/4 in.
• Voltage: 120 VAC
• Current: Max 1.5 A
• Normally closed (Closed when de-energized)
* A slow-closing solenoid is recommended to
prevent water hammer from occurring.
Solenoid Valve
[CN238]
SV
4. Press the /
buttons
to navigate through
the “Technical Data”.
* Pressing and holding the button to change it
in increments of 10.
2 sec.
(Data No. 03)
(e.g.: 100)
Connecting Electricity
Summary of Contents for GHQ-C3201WX-FF PB US
Page 9: ...9 Memo About the Combi Boiler ...
Page 84: ......