3 Hints for qualified personnel
This section describes how to install and commission the NOVUS, how to analyse errors and how to carry
out special maintenance work.
Prinzipal configuration of the system
3.1
Fig 17: General system outline with MVHR NOVUS and integrated defroster, version LEFT
The basic configuration of the system is universally valid and does not represent the
system outline of the project-related ventilation plant! It is designed for representation of
the plant-specific system structure for sensors and ventilation equipment.
Installation
requirements
3.2
For proper installation, the following requirements must be fulfilled:
•
Assembly in accordance with the general and on-site safety and installation instructions, amongst
others of the electric power station and water works as well as in accordance with the instructions
contained in this operating manual.
•
Frost-free room in the interior
•
Voltage supply 230 Vac, 50-60 Hz
Summary of Contents for NOVUS 300
Page 1: ...Version 2 0_10 2014 EN...
Page 59: ...59 Dimensional sketch 3 9 5 Fig 47 Dimension drawing HRU NOVUS...
Page 60: ...60 Plant 1 circuit diagram NOVUS 3 9 6...
Page 61: ...61 Plant 2 circuit diagram NOVUS with integrated defroster 3 9 7...
Page 62: ...62 Plant 3 Terminal scheme of through terminal X10 3 9 8...